Following the designation of ATH Airport as coordinated for six days (17–22 September) during the S26 season and the updated runway parameters for this period, HSCA has revised the attached working procedure on temporary capacity reduction.
S26 ATH Temporary Level 3 Change due to Runway Capacity Reduction [17SEP – 22SEP] – Working Procedure
April 3, 2026